The reshaped and strengthened embankment on the eastern side. Leamland track works 111216 16720
The reshaped and strengthened embankment on the eastern side. Leamland track works 111216 167201
The reshaped and strengthened embankment on the eastern side. Leamland track works 111216 16733
Leamland track works 111216 16735 E
Leamland track works 111216 14603 E
The new ballast extends a little further than the re-laid track. Close up the change to the profile of the track from old to new is obvious. Leamland track works 111216 14621
Leamland track works 111216 16731 E
Leamland track works 111216 16732 E
Leamland track works 111216 14624 E
Leamland track works 111216 16730 E
Leamland track works 111216 14623 E
Walking back south. The intention was to create a steady well profiled gentle curve for the main line, and this has undoubtedly been achieved. Leamland track works 111216 16729
Leamland track works 111216 14622 E
Leamland track works 111216 16728 E
Leamland track works 111216 14620 E
Leamland track works 111216 16722 E
Leamland track works 111216 14604 E
Leamland track works 111216 16723 E
Leamland track works 111216 16734 E
An area of strengthened embankment on the west side. Leamland track works 111216 16736
Leamland Bridge works 231016 14240 E
Leamland Bridge works 231016 14239 E
Double track working has now resumed. Leamland Bridge works 231016 16520 E
Leamland Bridge works 231016 14212 E
North of the current worksite, with track ready to be laid once the point is installed. Leamland Bridge works 231016 14236 E
North of the current worksite, with sleepers ready to be laid once the point is installed. Leamland Bridge works 231016 16518 E
Leamland Bridge works 231016 14235 E
Leamland Bridge works 231016 14234 E
Leamland Bridge works 231016 14233 E
Leamland Bridge works 231016 14237 E
Some of the spoil that will be used to re-profile the eastern embankment. The digger gives scale. Leamland Bridge works 231016 14232 E
Leamland Bridge works 231016 16513 E
Leamland Bridge works 231016 14213 E
Leamland Bridge works 231016 14210 E
Leamland Bridge works 231016 16519 E
Leamland Bridge works 231016 14211 E
Leamland Bridge works 231016 14238 E
Work has started to re-profile the eastern embankment. Leamland Bridge works 231016 14209 E
Leamland Bridge works 231016 14215 E
Leamland Bridge works 231016 14214 E
Leamland Bridge works 161016 16472 E
Leamland Bridge works 161016 16473 E
Leamland Bridge works 161016 16475 E
Leamland Bridge works 161016 16474 E
Leamland Bridge works 161016 16479 E
If you have ever wondered how they jack up the track, here is your answer. Leamland Bridge works 161016 16482 E