Sheffield Park Carriage Shed (Woodpax HLF Project) 2009-2010
Three collections feature the construction of the Sheffield Park Carriage Shed, covering 2012, 2011 and 2009-2010 respectively. Together there are approximately 1260 photos available, arranged in roughly date order, with the most recent at the start of each gallery.
SCROLL DOWN to view the pictures. Click here to return to the main website index page.
A general view of the Woodpax site looking north from the footbridge. 15.12.2010 5455
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north from the footbridge, with the former Isfield building in the foreground. 15.12.2010 5457
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking down at the former Isfield building, with the preserved cobbled surface outside. 15.12.2010 5456
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Work is continuing on the conversion of the building to the Bulleid bookshop. This view looks north. 15.12.2010 5437
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A view of the Isfield building looking south. 15.12.2010 5436
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north towards the carriage shed from the south end of Platform 2. It is a tad soggy underfoot. 15.12.2010 5460
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Inside the carriage shed, looking north towards the virtually complete bat loft at the northern end. 15.12.2010 5420
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Turning round, this view looks south from the northern end of the carriage shed. Materials are now being cleared from inside. 15.12.2010 5422
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north along the length of the carriage shed from the southern end. Manholes stand proud of the current surface, indicating the eventual height of the floor after track laying next year. 15.12.2010 5423
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking south out of the carriage shed at a swamp. The decision to defer the track laying seems to have been very well justified. On the right the posts will support the rain water harvesting pipe that will run south to the water tower. 15.12.2010 5424
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking down at the southern end of the site from the footbridge. 15.12.2010 5459
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A longer view of the southern end of the site taken from the roof of the Plant Room. 15.12.2010 5467
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
The rubber surface covering the roof of the Plant Room is now complete, but largely hidden by materials in this shot. On the left a gentleman is installing the last section of guttering on the carriage shed. The boundary between the carriage shed and the adjacent buildings is now watertight. 15.12.2010
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
The canopy is being extended south as far as the beam indicated by the green arrow, but has yet to be installed. The new chimney is on the left. 15.12.2010 5466
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking south along the roof of the toilet block and the Plant Room. 15.12.2010 5462
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Some of the brick detail on the new chimney. You will be hard pressed to see this from the ground, but it is typical of the high quality of the work. 15.12.2010 5465
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Work on fitting the new zinc surface to the canopy was in progress. This view looks north. 15.12.2010 5464
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking south at the original section of the canopy where the zinc surface was being installed. 15.12.2010 5480
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
The first part of the job is to fit the zinc around the chimney and in the area below the carriage shed roof. Water drains south from the point where the plank has been positioned. The other side of the plank it drains north towards the River Ouse. 15.12.2010
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north along the virtually complete Museum roof in somewhat inclement conditions. This area is now watertight (but the photographer is not....) 15.12.2010 5475
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
The reverse of the previous view looking south along the whole section of the Museum roof. 15.12.2010 5476
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north down from the Museum roof. The section north of the station is being landscaped, with the area sloped so that water runs naturally down to the River Ouse, to the right of the old Pump House in the distance. 15.12.2010 5478
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Replacement of a small area of the roof. 15.12.2010 5482
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A second view of the area north of the station, with landscaping in progress. 15.12.2010 5427
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A unique photographic viewpoint as 34059 departs with a private Pullman charter. 15.12.2010 5485
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A unique photographic viewpoint as 34059 departs with a private Pullman charter. 15.12.2010 5486
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A unique photographic viewpoint as 34059 departs with a private Pullman charter. 15.12.2010 5492
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Withyham signal box has now been uncovered. 15.12.2010 5430
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Withyham Signal Box. Note that the windows (and roof) have been refurbished, with other areas still to receive attention. 15.12.2010 5432
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Withyham signal box uncovered. 15.12.2010 5510
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Withyham signal box uncovered. 15.12.2010 5512
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Withyham signal box uncovered. 15.12.2010 5509
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
34059 poses alongside Withyham signal box. 15.12.2010 5454
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking south along the length of Platform 2. 15.12.2010 5449
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
The position of Withyham signal box in relation to the Museum building. 15.12.2010 5448
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A reasonably clear view of the northern section of the Museum building is now available. 15.12.2010 5447
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking south down the newly resurfaced Platform 2, past the water crane. The final surface cannot be applied until the weather is more suitable and the ambient temperature higher. 15.12.2010 5434
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
A closer view of the water crane. 15.12.2010 5508
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north towards the slope down to the Pullman Room. 15.12.2010 5506
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking south down Platform 2, with one of the new platform lamps on the right adjacent to the Museum door. 15.12.2010 5507
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north from Platform 1 towards the northern end of the Museum. 15.12.2010 5445
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
At the southern end of Platform 2 (north of the footbridge) the canopy will be extended towards the camera. 15.12.2010 5468
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Inside the Plant Room equipment is now being installed. 15.12.2010 5474
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Emergency arrangements in the toilets to ensure that the plaster is not damaged by the unusually cold weather. 15.12.2010 5473
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Site management have a unique way of indicating a wall that should not have been plastered... 15.12.2010 5469
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Inside the Museum, looking south from the northern end. 15.12.2010 5505
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
Looking north in the Museum. 15.12.2010 5497
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway
The southern end of the Museum, with the original facade on the left. The wall between the Museum and toilets is now installed, to the great relief of all concerned... 15.12.2010 5493
WoodpaxHeritage Lottery FundHLFSheffield ParkCarriage ShedBluebell Railway